Document Library: Documents
18 records found...
Displaying Page 1 of 1
Title Category File Size Date Created Date Updated
SCM/19-104/S.pdf
PROFESSIONAL CIVIL ENGINEERING SERVICES-Water Master Plan draft document as per section 33 and 116 of the MFMA
Tenders DRAFT 2 MB 30 Apr 2019 30 Apr 2019
Annexure D - Appendix A - Water Master Plan 2005-2020.pdf
Annexure D - Appendix A - Colchester Zone
I&E 225 KB 17 Jan 2017 17 Jan 2017
Annexure D - Water Master Plan 2005-2020.pdf
Annexure D - Upgrading Of The Bulk Water Supply System For Colchester-Cannonville
I&E 343 KB 17 Jan 2017 17 Jan 2017
Annexure C2 - Drawing C2 - Water Master Plan 2005-2020.jpg
Annexure C2 - Drawing C2 - Emerald Hill, Lovemore Heights, Schoenmakerskop, Heatherbank and Theescombe Zones
I&E 5.01 MB 16 Jan 2017 16 Jan 2017
Annexure C3 - Drawing C3 - Water Master Plan 2005-2020.jpg
Annexure C3 - Drawing C3 - Gelvandale, Struandale, Glendinning and Fairview Zones
I&E 4.42 MB 16 Jan 2017 16 Jan 2017
Annexure C4 - Drawing C - Water Master Plan 2005-2020.jpg
Annexure C4 - Drawing C4 - Motherwell, Balmoral, Fairbridge Heights, Amanzi, Amanzi Tower and Coegakop Zones
I&E 5.77 MB 16 Jan 2017 16 Jan 2017
Annexure C5 - Drawing C5 - Water Master Plan 2005-2020.jpg
Annexure C5 - Drawing C5 - IDZ and Colchester Zones
I&E 3.79 MB 16 Jan 2017 16 Jan 2017
Annexure C6 - Drawing C6 - Water Master Plan 2005-2020.jpg
Annexure C6 - Drawing C6 - Bethelsdorp, Bloemendal, Chatty, Van Der Kemp, Scheepershoogte, Kwanobuhle and Despatch Zones
I&E 5.66 MB 16 Jan 2017 16 Jan 2017
Annexure C7 - Drawing C7 - Water Master Plan 2005-2020.jpg
Annexure C7 - Drawing C7 - Uitenhage Zones
I&E 5.45 MB 16 Jan 2017 16 Jan 2017
Annexure C8 - Drawing C8 - Water Master Plan 2005-2020.jpg
Annexure C8 - Drawing C8 - Chelsea, Greenbushes, Seaview Upper, Seaview Lower, Beachview Township and Kini Bay Zones
I&E 6.15 MB 16 Jan 2017 16 Jan 2017
Annexure C9 - Drawing C9 - Water Master Plan 2005-2020.jpg
Annexure C9 - Drawing C9 - St Albans and Rocklands Zone
I&E 5.24 MB 16 Jan 2017 16 Jan 2017
Annexure E - Water Master Plan 2005-2020.pdf
Annexure E - Analysis of Future Kouga Zone Demand
I&E 150 KB 16 Jan 2017 16 Jan 2017
Annexure C1 - Drawing C1 - Water Master Plan 2005-2020.jpg
Annexure C1 - Drawing C1 - Driftsands, Airport and St Georges Zones
I&E 4.41 MB 16 Jan 2017 16 Jan 2017
Annexure B2 - Drawing B2 - Water Master Plan 2005-2020.jpg
Annexure B2 - Drawing B2 - Proposed Gamtoos to Summit Booster
I&E 6.32 MB 16 Jan 2017 16 Jan 2017
Annexure B1 - Drawing B1 - Water Master Plan 2005-2020.jpg
Annexure B1 - Drawing B1 - Nooitgedagt to Motherwell Low Level Scheme
I&E 3.38 MB 16 Jan 2017 16 Jan 2017
Annexure A - Water Master Plan 2005-2020.pdf
Annexure A - Water Resources and Bulk Supply Infrastructure
I&E 4.32 MB 16 Jan 2017 16 Jan 2017
Annexure F - Water Master Plan 2005-2020.jpg
Annexure F - Theescombe Reservoir Zone Proposed Bulk Infrastructure (Proposed Infrastructure Plan)
I&E 6.81 MB 16 Jan 2017 16 Jan 2017
Water Master Plan 2005-2020.pdf
Water Master Plan 2005-2020 (Prepared by Afri-Coast Engineers (Pty) Ltd - June 2006)
I&E 19.03 MB 13 Jan 2017 16 Jan 2017
Using a Touch Screen?
Click below for instructions to fix Touch/Swipe issues experienced in Microsoft Edge.

Show me the fix! No thanks
×
Eskom has decreased loadshedding to Stage 2.
Groups 6, 7 will be switched on at 09H00; geysers will remain off until 10H00.
From 10H00 to 12H30, Groups 1, 2 will be switched off; Groups 3, 4 from 12H00 to 14H30; Groups 5, 6 from 14H00 to 16H30; Groups 7, 8 from 16H00 to 18H30; geysers, Group 2 from 18H00 to 20H30; Groups 3, 4 from 20H00 to 22H30; Groups 5, 8 from 22H00 to 02H30.
CLOSE NOTICE
This might take a while depending on your connectivity.
Please be patient while we search the entire site & all its modules for you...